Manufacturer of aluminum
formwork
WALL-TIES
& FORMS
Contacts Processes

Receive guidance to choose the best option

    Complete: + 85 = 86

    Our System

    The WTF formwork system (manufactured by Wall-Ties & Forms, Inc.) is unique and stands out because all the components in the structure, such as walls, foundations, columns, beams, stairs, window moldings, balconies, and decorative details, are molded and constructed monolithically, accurately complying with the architectural design.

    Assembly

    No skilled labor or heavy machinery or cranes are required for the assembly of the WTF System.

    Versatility

    The WTF aluminum formwork system for in-situ concrete construction is the most versatile system in the world.

    ABOUT US

    WALL-TIES & FORMS, INC. (WTF)

    It is one of the world’s leading producers of aluminum formwork for concrete and, at the same time, the main company designing and manufacturing aluminum formwork systems. Over 45 years ago, WTF began its production with thousands of formwork ties. Today, it produces and ships over 30 million ties and more than 100,000 aluminum formwork panels per year.

    OUR BENEFITS

    Durability:

    Extremely wear-resistant, ideal for long-lasting construction projects.

    Structural Strength:

    Capable of withstanding heavy loads and high pressures without deforming or breaking, ensuring the quality of the concrete.

    Reuse:

    They can be reused in multiple projects, making them a long-term investment.

    Labor Cost Reduction:

    Require less time and labor to assemble and dismantle, reducing labor costs.

    Increased Construction Speed:

    They can be quickly assembled and dismantled, speeding up the construction process and improving efficiency.

    CONSTRUCTION PROCESSES

    Initial Phase

    Excavations for various types of electrical, plumbing, drainage, natural gas installations, and the WTF foundation slab system are carried out.

    Mid-Phase

    Both the wall formwork and slab formwork are manually assembled, preferably starting from the corners.

    Finishing the Stage

    After pouring the concrete, the formwork is removed, and the process is restarted for the next structure.

    Business partners

    Name: Wisam Ali Abdulhussein

    Iraq distributor.

    E-mail: Wisamir1974@Gmail.com

    Company Name: Summit Solutions Company.

    Phone: 0094-771-494-6911

    We are at your service

    CONTACTS

    Address:

    4000 Bonner Industrial Drive Shawnee, Kansas USA 66226

    RECEIVE GUIDANCE TO CHOOSE THE BEST OPTION

      Complete: 45 + = 47

      Menú